Skip to main content
Supplying across the UAE — Dubai · Abu Dhabi · Sharjah · Ajman · RAK · Fujairah · Al Ain +971 50 855 3875WhatsApp
Rates · variables · quote checklist

HDPE Geomembrane Price

Indicative UAE rates by thickness, what installation and testing add, and the seven lines to check before you compare two quotations.

Supply from≈ AED 15/m²
Install adds≈ AED 8–16/m²
Per ft²≈ AED 1.4 – 8.8
Firm quoteSame working day
Estimating HDPE geomembrane price per square metre for a UAE lining project

What HDPE geomembrane costs in the UAE

Nobody can give a binding HDPE geomembrane price without knowing the thickness, the area and whether installation is included. What we can do is publish the ranges honestly, explain what moves a quote inside them, and let you sanity-check whatever numbers you are being shown.

The figures below are indicative market ranges for the UAE in 2026, in dirhams, for supply-only roll goods delivered within the country. They move with polymer prices, freight and order size, so treat them as a bracket rather than a quotation.

One thing worth stating plainly: a quote that is dramatically below this range is usually below it for a reason — thinner sheet than specified, recycled or off-spec resin, no certificates, or seam testing and documentation quietly left out of the scope.

For a firm number

Send the area, depth, slope angle, application and delivery emirate through the enquiry form. A written quotation with a roll schedule and material data sheet usually comes back the same working day.

Get a firm quotation


Supply-only price ranges by thickness

Indicative HDPE geomembrane supply rates — UAE, 2026
ThicknessApprox. AED / m²Approx. AED / ft²Notes
0.50 mm15 – 221.4 – 2.0Temporary works and short-life storage
0.75 mm20 – 301.9 – 2.8The volume grade for farm and irrigation reservoirs
1.00 mm26 – 382.4 – 3.5Long-life exposed water storage
1.25 mm32 – 463.0 – 4.3Heavier duty water and effluent containment
1.50 mm38 – 553.5 – 5.1Usual minimum for landfill and regulated containment
2.00 mm50 – 724.6 – 6.7Heavy duty, steep slopes, plant trafficking
2.50 – 3.00 mm62 – 955.8 – 8.8Severe chemical or mechanical exposure

Indicative supply-only ranges for standard black smooth sheet, delivered within the UAE. Textured sheet typically carries a premium over smooth. Currency conversion at roughly 10.76 ft² per m².


What installation adds

Installation is priced separately because plenty of clients do not need it. When it is included, these are the components that make up the rate.

Indicative installed cost components
ComponentApprox. AED / m²What it covers
Deployment and welding8 – 16Crew, plant, hot wedge and extrusion welding, trimming, anchor trench placement
Seam testing2 – 5Air pressure testing, vacuum box, trial welds, destructive samples
QA documentation1 – 3Panel as-built, weld logs, test records, repair register, certificates
Geotextile cushion (200 g/m²)6 – 12Supply and lay where the subgrade needs protection
MobilisationLump sumFixed cost per mobilisation — proportionally heavy on small areas
Why small jobs cost more per square metre

Mobilisation, trial welds, testing equipment and documentation are largely fixed costs. Spread over 400 m² they dominate the rate; spread over 40,000 m² they almost disappear. This is why a 500 m² pond can be double the per-square-metre rate of a large reservoir.


The six variables that move your price

1. Thickness

The largest single factor. Material cost scales almost linearly with thickness, so moving from 0.75 mm to 1.5 mm roughly doubles the sheet cost.

2. Total area

Larger orders buy better per square metre — both on material and on the fixed costs of installation. The steepest improvement is between a few hundred and a few thousand square metres.

3. Texture and surface

Textured sheet costs more than smooth. White-over-black costs more again. Both are worth it in the right application and wasted money in the wrong one.

4. Geometry

A rectangular reservoir with clean slopes is cheap to line. Irregular shapes, many corners, sumps and multiple pipe penetrations add welding hours that do not show up in the square metre count.

5. Scope of testing

Air pressure testing every seam and issuing a full QA file costs real money. It is also the difference between a liner you can prove and a liner you hope about.

6. Access and season

Remote sites, restricted gate hours and summer heat all reduce productive hours per day. A July installation in Al Dhafra is not the same programme as a January one in Dubai.


Reading a geomembrane quotation properly

If you are comparing quotes, check these seven lines before you compare the totals. In our experience they explain nearly every price gap.

Quotation checklist
CheckWhy it matters
Is the area plan area or developed area?Developed area includes slopes and anchor trench and can be 15–40 % larger. A quote against plan area will need a variation later.
What thickness, exactly?“Approximately 1 mm” is not a specification. Nominal thickness and minimum average thickness are different numbers.
Smooth or textured?A textured quote against a smooth one is not a like-for-like comparison.
Are certificates included?Mill certificates traceable to delivered roll numbers, not a generic brochure.
Is seam testing in scope?Air pressure and vacuum testing of every seam, with a log.
Is geotextile included?Often excluded then added as a variation once the subgrade is seen.
Are penetrations included?Pipe boots and puddle flanges are skilled work and are frequently excluded.

Ask every supplier to confirm those seven in writing. The cheapest quote often stops being the cheapest once they do.


Get a written quotation

Give us the area in square metres, the liner thickness and the application. We reply with a written quotation, material data sheet and an indicative delivery date.

We use what you send only to prepare your quotation. No sales calls, no list sharing.


Answers for specifiers & buyers

Frequently asked questions

What is the cost of geomembrane per square foot?

Roughly AED 1.4 to AED 8.8 per square foot for supply-only material, depending on thickness — that is about AED 15 to AED 95 per square metre. Installed rates add approximately AED 1 to AED 2 per square foot for welding, testing and documentation. Thickness and total area are the two variables that move it most.

How much does it cost to line a 1,000 m² pond?

As a rough order of magnitude, 1,000 m² of plan area becomes roughly 1,200–1,350 m² of sheet once slopes and anchor trench are included. In 0.75 mm supply-only that is broadly AED 24,000–40,000 of material; installed with testing and documentation, expect meaningfully more. A firm figure needs the depth, slope angle and subgrade condition.

Is thicker geomembrane always better value?

No — it is better value where the liner is exposed, trafficked, or protecting something whose loss would be expensive. For a covered pond with a clean sand subgrade and a short design life, paying for 2 mm sheet is money spent on capability you will never use.

Do prices include delivery across the UAE?

Quotations state delivery explicitly. Within the main Dubai–Sharjah–Abu Dhabi corridor freight is usually a modest component; remote sites in Al Dhafra, the east coast or the northern emirates carry more. It is always shown as its own line rather than buried in the rate.

Can you match a cheaper quotation?

Sometimes, and sometimes we will tell you the other quote is cheaper because it is for a different product. Send it over — if it is genuinely like for like we will sharpen ours, and if it is not we will point out precisely which line differs so you can make the comparison yourself.


Related pages


Need a price on HDPE geomembrane this week?

Send the area, thickness and emirate. You get a written quotation with material data sheets attached — usually the same working day.

Open the enquiry form
WhatsApp